+32 3 230 40 11 · info@marcottestyle.com Kapellen showroom · by appointment

Renovation at Marcotte Style

Renovation

From shell to key, with one point of contact and one schedule. We draw the new layout, coordinate the trades and finish right through to the furniture.

What it is

From shell to key

A renovation with us does not stop at the shell. We draw the new layout, have the services follow it and finish right through to the cabinetry, the textiles and the lighting. You have one point of contact and one schedule, from the first survey to the last adjustment.

What we draw goes into the same file as for a complete interior: survey drawing, layout plan, joinery drawings, lighting and electrical plan, schedule of materials and a 3D with a specification.

  • Walls removed or added, with the openings set out on the plan
  • Services renewed: pipework, drainage, electrics and lighting
  • Floors and ceilings, right down to the skirting and the cornice
  • Joinery and furniture, drawn on the same sheet
  • Installation by our own team, with the trades coordinated

The file

A drawing for every trade

Everything is discussed beforehand and set down in a renovation file. It holds not one drawing but a series: every trade gets its own, with the dimensions that apply to it.

That way everyone knows what is expected before they arrive on site, and nobody has to decide on site what should have been on paper.

  • Demolition, showing what stays and what may go, down to the wall
  • Shell, the new openings and the load-bearing parts
  • Plumbing, the pipework and drainage set to the dimensions of the unit
  • Electrics and lighting, every point, every switch, every dimmed circuit
  • Plastering, with the re-measured walls the joinery meets
  • Tiling, the setting out and where the cut falls
  • Joinery, each fitted cabinet drawn separately, to the millimetre
A detail of a floor plan for a conversion, with the kitchen, the bedrooms and the joinery drawn in.

Everything reconciled on one drawing

This is a detail of a floor plan for a conversion. The new kitchen, the bedrooms, the fitted cabinets and the furniture all appear together. On paper you can already see whether a door still opens once the cabinet is in place, and whether a chair can get past behind the table.

Before and after

The same room, twice

Drag the handle aside and you see what happened to the room. The viewpoint is the same each time, so the comparison is honest. None of these rooms became any larger.

The bathroom, back to the pipework

Everything out down to the shell: the pipework run again, the drain moved to where the unit goes, and only then the tiles.

The same bathroom finished in black marble, with a floating unit and a walk-in shower.
A bathroom stripped back to the shell, with new pipework against the walls.
Before After

The kitchen, laid out again

The old kitchen sat in a closed room. Opening the wall brought a view of the garden, and moved the cooking area to the other side.

The same room open to the garden, with a black range and a long worktop.
A closed kitchen in dark oak, with the working area against the window wall.
Before After

The living space, from crowded to open

The same square metres, divided differently. The route now runs along the window wall, so a table for ten fits where a seating group used to stand.

The same room with a long dining table, panelling against the wall and a pale floor.
A crowded living space with a low ceiling and a wall in bare brick.
Before After

The staircase, brought into the light

The staircase stayed exactly where it was. What changed is the finish: the treads sandblasted, the handrail lacquered white and the wall behind it plastered.

The same staircase lacquered white, against a plastered wall with light from above.
An oak staircase against a wall in bare brick, with a dark handrail.
Before After

The attic, turned into a dressing room

An attic nobody used. The sloping sides are filled with fitted cabinets, and the roof window now lights the mirror instead of a pile of boxes.

The same attic as a dressing room, with oak cabinets right up to the slope.
An attic with loose material and a floor covering, used for storage.
Before After

The bedroom, made calmer

The red wall and the timber ceiling made the room feel low. White panelling and a built-in wall of cabinets make it look taller than it is.

The same room with white panelling, built-in cabinets and a desk under the roof window.
A bedroom with a red wall, a timber ceiling and a rug.
Before After

The study, out of nothing

A room in bare shell, the floor still open. It now holds a fitted desk, with the cables run inside the cabinet.

The same room with a white fitted desk and closed cabinets above it.
A room in bare shell with props, a ladder and an open floor.
Before After

The hall, laid out again

The staircase stayed, the rest did not. What was a passage became a room in its own right, with the cabinets set into the wall and the light aimed at the stairs.

The same hall after the works, with built-in cabinets and light on the stairs.
A hall before the works, with the old finish and the existing staircase.
Before After

The main bathroom

The same square metres, with the shower moved to the side where the drain could go. That left room for a double basin where a bath used to stand.

The main bathroom after the works, with a double basin and a walk-in shower.
The main bathroom before the works, with the old layout.
Before After

During the works

The stage nobody photographs

This is where it is decided whether the result will be right. A drain twenty centimetres too high, a light beside the table instead of above it: there is no neat way to fix that afterwards. That is why we are on site, and not only at the unveiling.

These images come from a single house in Temse. From a boarded-up facade to the orangery that now stands against it, with everything in between that you will never see again.

From bare shell to finish

The interior stripped back to the brick, with the new ceiling structure already in place overhead.
The inside back to the brick, with the ceiling already set out.
A steel structure being fitted into the opening in the facade.
The steel structure goes in before the facade is opened.
An external wall broken open back to the shell, with props and materials in the room.
The wall open, with the opening at the size given on the plan.
A herringbone parquet being laid over the old tiled floor.
The new parquet goes over the old tiles, without breaking everything out.
A terrace in large slabs on adjustable pedestals, during laying.
The terrace on pedestals, so it stays level and the water can drain away.

The orangery, from structure to room

The same viewpoint, two moments. First the steel structure in the rain, then the orangery with the glazing and the joinery in place. What you see in the first photograph decides how the second one looks.

A finished orangery with white windows against a villa, with a terrace in front.
The steel structure of an orangery under construction, with props and materials on site.
During After

The order of works

What goes wrong when the works run in the wrong order

Joinery always comes last. First the pipework and the electrics, then the screed, the plastering and the floor. Have a kitchen fitted before the floor is down and you pay for it twice.

  • Pipework and drainageThe drain is in before the unit is drawn, so the basin shifts twenty centimetres.The unit is drawn first, then the drain is set to that dimension.
  • Electrics and lightingThe sockets disappear behind the wall of cabinets and the light hangs beside the table.The lighting plan follows the layout plan, so every point sits where the furniture goes.
  • Screed and floorThe joinery is fitted before the screed is dry, and the skirting meets nothing cleanly.Screed and floor go down first, and the joinery is measured to the finished height.
  • PlasteringThe cabinet goes against a rough wall and the gap is filled with sealant.The walls are plastered and re-measured before the cabinet goes into production.
  • Joinery and installationEverything arrives at once and the teams stand waiting for each other.We schedule the trades one after another, so nobody stands idle and nothing is done twice.

Saving money

Saving in the right place

Saving money is not the same as working cheaply. In some places a saving costs you double later; in others a different choice gives a better result straight away. Two examples from our own sites.

  • Tiles: do not work over themSticking new tiles onto the old ones. After a few years cracks appear and tiles come loose.Take the old tiles off completely, level the wall, and only then start tiling. Even, and it lasts.
  • Walls: do not always add moreBuilding new walls to divide an open space, and then still having to finish them.A finished oak wall in the middle of the room, with the kitchen built against it. One finishing trade saved, and it looks better.

What we take off your hands

You do not have to referee between contractors.

  • 01One scheduleThe plumber, the electrician, the plasterer and the floor layer follow on from one another. Not a day is lost waiting.
  • 02One point of contactThe same person follows the file from the first survey to the last adjustment, and is reachable throughout the works.
  • 03One price on paperThe specification runs item by item. What is included and what is not is on paper before the works begin.
A fitted wall of cabinets installed in a room where the floor is already down, during the works.

Renovating in phases, so you can stay at home

A renovation does not have to happen all at once. In Meerdonk the ground floor came first and the upper floor a year later, so the residents could stay upstairs during the works instead of moving out for a year. That only works if the schedule is in one pair of hands: each phase is finished and handed over clean before the next one starts.

More of what we do

What goes into the house after the renovation.

With us a renovation is the beginning. What comes after it we draw in the same file, so that the cabinetry, the curtains and the lighting are matched to one another.


Finally

Your home is next

A first conversation costs you nothing. We come to you to take measurements, or you visit the showroom in Kapellen. The file follows, in the order of the works. We work throughout Flanders and Brussels, and just as readily beyond.

Make an appointment at your home or in the showroom
  • Who we areMarcotte Style, complete interiors for twenty-five years
  • ShowroomKapellen, by appointment, and we come to your home
  • DrawingsOur own studio: floor plan, joinery drawing, lighting and electrical plan, 3D with specification
  • ExecutionInstallation by our own team, with the trades coordinated
  • ImagesOur own projects, photographed before and after the works

We use cookies

We use cookies to improve your experience on this website. You may choose which types of cookies to allow and change your preferences at any time. Disabling cookies may impact your experience on this website. You can learn more by viewing our Cookie Policy.